ITAC Assessment: AS0469
ITAC logo
ITAC Assessment: AS0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Dietary Supplements
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 250,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,940
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $395,965 9,360,000
kWh
Electricity Demand $259,651 19,334
kW-mo/yr
Electricity Fees $134,211 -
TOTAL YEARLY COSTS $789,827
RECOMMENDED SAVINGS* $43,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,924 $37,163 $12,942
305,966
kWh
$9,982
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,730 $10,305 $6,058
143,225
kWh
$4,672
-
kW-mo/yr
03 2.7145: Install skylights $4,029 $14,835 $4,029
95,251
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,578 $900 $2,020
47,750
kWh
$1,558
-
kW-mo/yr
05 2.6231: Utilize controls to operate equipment only when needed $1,906 $420 $1,076
25,428
kWh
$830
-
kW-mo/yr
TOTAL RECOMMENDED $43,167 $63,623 $26,125
617,620
kWh
$17,042
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs