Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Steel gears, aluminum parts and assembled gear cases for boa
NAICS
n/a
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 219
Plant Area 128,000
ft2
Annual Production 180,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $410,053 11,875,147
kWh
Electricity Demand $110,243 30,511
kW-mo/yr
Electricity Fees $14,653 -
LPG $44,660 8,641
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $649,915 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $648,315

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
01 3.5112: Reprocess spent oils on site for re-use $603,410 $51,350 - - - $554,610
-
gal
- $48,800 -
02 4.122: Develop standard procedures to improve internal yields $28,800 $21,900 - - - - - - $28,800
03 2.7131: Add area lighting switches $8,900 $13,600 $8,900
269,637
kWh
- - - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,325 $5,000 $3,675
111,372
kWh
$650
-
kW-mo/yr
- - - - -
05 3.5316: Contract a wood pallet recycling company $2,880 - - - - - $2,880
-
lb
- -
06 2.6212: Turn off equipment during breaks, reduce operating time $1,600 - - - $1,600
-
MMBtu
- - - -
TOTAL RECOMMENDED $649,915 $91,850 $12,575
381,009
kWh
$650
-
kW-mo/yr
$1,600
-
MMBtu
$554,610
-
gal
$2,880
-
lb
$48,800 $28,800
TOTAL IMPLEMENTED $648,315 $91,850 $12,575
381,009
kWh
$650
-
kW-mo/yr
- $554,610
-
gal
$2,880
-
lb
$48,800 $28,800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs