ITAC Assessment: AS0466
ITAC logo
ITAC Assessment: AS0466
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Commercial paper rolls
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 188
Plant Area 243,000
ft2
Annual Production 8,600,000
units
Production Hrs. Annual 6,096
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,413 4,255,090
kWh
Electricity Demand $170,884 11,131
kW-mo/yr
Electricity Fees $66,261 -
TOTAL YEARLY COSTS $526,558
RECOMMENDED SAVINGS* $118,207 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $118,207

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.8112: Combine utility meters $60,673 $416 - - $60,673
02 2.4133: Use most efficient type of electric motors $36,247 $79,305 $25,957
370,808
kWh
$10,290
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,685 $900 $3,971
56,729
kWh
$1,714
-
kW-mo/yr
-
04 2.4224: Upgrade controls on compressors $5,468 $17,280 $3,819
54,559
kWh
$1,649
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $5,430 $2,739 $4,752
67,885
kWh
$678
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,704 $500 $3,286
46,934
kWh
$1,418
-
kW-mo/yr
-
TOTAL RECOMMENDED $118,207 $101,140 $41,785
596,915
kWh
$15,749
-
kW-mo/yr
$60,673
TOTAL IMPLEMENTED $118,207 $101,140 $41,785
596,915
kWh
$15,749
-
kW-mo/yr
$60,673
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs