ITAC Assessment: AS0453
ITAC logo
ITAC Assessment: AS0453
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Capacitors
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3675: Electronic Capacitors
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 10,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 3,328
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,128 444,687
kWh
Electricity Demand $12,587 1,777
kW-mo/yr
Electricity Fees $7,293 -
TOTAL YEARLY COSTS $76,008
RECOMMENDED SAVINGS* $20,138 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6232: Install set-back timers $7,726 $83 $7,726
61,320
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,598 $5,816 $2,878
22,845
kWh
$720
-
kW-mo/yr
03 2.7232: Replace existing hvac unit with high efficiency model $4,076 $18,560 $3,311
26,280
kWh
$765
-
kW-mo/yr
04 2.7135: Install occupancy sensors $2,232 $1,350 $2,232
17,714
kWh
-
05 2.4133: Use most efficient type of electric motors $1,699 $685 $1,413
11,216
kWh
$286
-
kW-mo/yr
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $433 $240 $361
2,865
kWh
$72
-
kW-mo/yr
07 2.2511: Insulate bare equipment $374 $55 $348
2,759
kWh
$26
-
kW-mo/yr
TOTAL RECOMMENDED $20,138 $26,789 $18,269
144,999
kWh
$1,869
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs