ITAC Assessment: MS0364
ITAC logo
ITAC Assessment: MS0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Pine Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 3,018,240
ft2
Annual Production 84,162
thousand feet
Production Hrs. Annual 2,500
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $865,502 13,464,000
kWh
Electricity Demand $393,364 47,376
kW-mo/yr
Electricity Fees $(-6,865.0) -
Wood $0.0 637,519
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,405 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,898 $11,711 $11,560
179,787
kWh
$2,133
-
kW-mo/yr
$205 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,602 $500 $10,445
160,057
kWh
- $157 -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,114 $490 $2,237
34,800
kWh
$1,809
-
kW-mo/yr
$68 -
04 2.2136: Install / repair insulation on steam lines $10,791 $20,863 - - - $10,791
-
MMBtu
TOTAL RECOMMENDED $39,405 $33,564 $24,242
374,644
kWh
$3,942
-
kW-mo/yr
$430 $10,791
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs