ITAC Assessment: AS0452
ITAC logo
ITAC Assessment: AS0452
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Marketing Material, Commercial Printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 3,060
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,897 945,000
kWh
Electricity Demand $19,983 3,278
kW-mo/yr
Electricity Fees $475 -
TOTAL YEARLY COSTS $107,355
RECOMMENDED SAVINGS* $18,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,516

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $7,381 $29,400 $5,803
63,077
kWh
$1,578
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,940 $20 $4,543
47,254
kWh
$397
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,195 $8,487 $2,472
27,471
kWh
$723
-
kW-mo/yr
04 2.7135: Install occupancy sensors $1,822 $2,775 $1,822
19,803
kWh
-
05 2.6232: Install set-back timers $749 $675 $749
8,143
kWh
-
TOTAL RECOMMENDED $18,087 $41,357 $15,389
165,748
kWh
$2,698
-
kW-mo/yr
TOTAL IMPLEMENTED $15,516 $37,907 $12,818
137,802
kWh
$2,698
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs