ITAC Assessment: AS0443
ITAC logo
ITAC Assessment: AS0443
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Printed and Die-Cut Components
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 100,000
ft2
Annual Production 6,190,500
units
Production Hrs. Annual 5,900
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,248 1,757,600
kWh
Electricity Demand $52,934 5,292
kW-mo/yr
Electricity Fees $40,979 -
Natural Gas $7,588 6,139
MMBtu
Waste Disposal Costs
Water Usage $5,274 615
Tgal
TOTAL YEARLY COSTS $263,023
RECOMMENDED SAVINGS* $48,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,992

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,407 $2,838 $1,247
14,016
kWh
$160
-
kW-mo/yr
02 2.7132: Install timers on light switches in little used areas $716 $675 $716
8,049
kWh
-
03 2.4224: Upgrade controls on compressors $27,764 $4,325 $23,473
263,737
kWh
$4,291
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,821 $140 $15,320
172,139
kWh
$3,501
-
kW-mo/yr
TOTAL RECOMMENDED $48,708 $7,978 $40,756
457,941
kWh
$7,952
-
kW-mo/yr
TOTAL IMPLEMENTED $47,992 $7,303 $40,040
449,892
kWh
$7,952
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs