Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Acrylic Hot Tubs
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3088: Plastics Plumbing Fixtures
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 12,000
units
Production Hrs. Annual 3,188
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,532 2,084,590
kWh
Electricity Demand $35,030 6,971
kW-mo/yr
Electricity Fees $488 -
Natural Gas $12,743 1,272
MMBtu
Waste Disposal Costs
Water Usage $7,828 2,010
Tgal
TOTAL YEARLY COSTS $199,621
RECOMMENDED SAVINGS* $30,397 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4224: Upgrade controls on compressors $25,870 $7,794 $21,042
304,960
kWh
$4,828
-
kW-mo/yr
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,847 $5,691 $2,847
41,263
kWh
-
03 2.7135: Install occupancy sensors $1,680 $720 $1,680
24,353
kWh
-
TOTAL RECOMMENDED $30,397 $14,205 $25,569
370,576
kWh
$4,828
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs