ITAC Assessment: UA0277
ITAC logo
ITAC Assessment: UA0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Coffee
NAICS 311920: Coffee and Tea Manufacturing
SIC 2095: Roasted Coffee
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 322,841
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $542,666 6,900,195
kWh
Electricity Demand $144,752 18,989
kW-mo/yr
Electricity Fees $35,756 -
Natural Gas $764,573 63,392
MMBtu
TOTAL YEARLY COSTS $1,487,747
RECOMMENDED SAVINGS* $80,677 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $31,464 $8,591 $29,909
380,523
kWh
$1,555
02 2.4231: Reduce the pressure of compressed air to the minimum required $27,216 $2,500 $25,871
329,144
kWh
$1,345
03 2.7232: Replace existing hvac unit with high efficiency model $14,476 $81,775 $13,760
175,069
kWh
$716
04 2.3212: Optimize plant power factor $3,523 $4,208 - $3,523
05 2.7135: Install occupancy sensors $3,286 $3,921 $3,124
39,749
kWh
$162
06 2.8114: Change rate schedules or other changes in utility service $712 $800 - $712
TOTAL RECOMMENDED $80,677 $101,795 $72,664
924,485
kWh
$8,013
TOTAL IMPLEMENTED $712 $800 - $712
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs