ITAC Assessment: AS0441
ITAC logo
ITAC Assessment: AS0441
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Small firearms
NAICS 332994: Small Arms, Ordnance, and Ordnance Accessories Manufacturing
SIC 3484: Small Arms
Sales Range $100
M
to 500
M
# of Employees 690
Plant Area 211,115
ft2
Annual Production 1,114,687
units
Production Hrs. Annual 5,334
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $612,417 13,916,000
kWh
Electricity Demand $397,785 30,739
kW-mo/yr
Electricity Fees $312,278 -
Natural Gas $25,350 15,134
MMBtu
Waste Disposal Costs
Water Usage $85,025 7,556
Tgal
TOTAL YEARLY COSTS $1,432,855
RECOMMENDED SAVINGS* $186,744 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,783

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4224: Upgrade controls on compressors $174,581 $25,494 $131,456
3,020,025
kWh
$43,125
-
kW-mo/yr
02 2.4322: Use or replace with energy efficient substitutes $10,783 $37,000 $10,783
245,458
kWh
-
03 2.9112: Use solar heat to heat water $1,380 $1,005 $1,380
31,416
kWh
-
TOTAL RECOMMENDED $186,744 $63,499 $143,619
3,296,899
kWh
$43,125
-
kW-mo/yr
TOTAL IMPLEMENTED $10,783 $37,000 $10,783
245,458
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs