ITAC Assessment: AS0439
ITAC logo
ITAC Assessment: AS0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Electronic components
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,430 1,856,758
kWh
Electricity Demand $69,925 4,355
kW-mo/yr
Electricity Fees $8,788 -
Natural Gas $33,396 4,000
MMBtu
Waste Disposal Costs
Water Usage $11,102 1,612
Tgal
Water Disposal $7,540 1,662
Tgal
TOTAL YEARLY COSTS $251,180
RECOMMENDED SAVINGS* $16,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,293

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $629 $650 $317
4,662
kWh
$312
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,146 $4,770 $11,510
169,272
kWh
$2,636
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $1,293 $950 $522
7,680
kWh
$771
-
kW-mo/yr
-
04 3.7311: Maintain machines to reduce leaks $734 $545 - - $734
TOTAL RECOMMENDED $16,802 $6,915 $12,349
181,614
kWh
$3,719
-
kW-mo/yr
$734
TOTAL IMPLEMENTED $1,293 $950 $522
7,680
kWh
$771
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs