Assessment Year | 2017 |
---|---|
Principal Product | Electronic components |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3674: Semiconductors and Related Devices |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
50,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $120,430 | 1,856,758 |
kWh
|
$0.065 | |
Electricity Demand | $69,925 | 4,355 |
kW-mo/yr
|
$16.06 | |
Electricity Fees | $8,788 | - |
|
- | |
Natural Gas | $33,396 | 4,000 |
MMBtu
|
$8.35 | |
Waste Disposal Costs | |||||
Water Usage | $11,102 | 1,612 |
Tgal
|
$6.89 | |
Water Disposal | $7,540 | 1,662 |
Tgal
|
$4.54 | |
TOTAL YEARLY COSTS | $251,180 | ||||
RECOMMENDED SAVINGS* | $16,802 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $1,293 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $629 | $650 |
$317
4,662
kWh
|
$312
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,146 | $4,770 |
$11,510
169,272
kWh
|
$2,636
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,293 | $950 |
$522
7,680
kWh
|
$771
-
kW-mo/yr
|
- | |
04 | 3.7311: Maintain machines to reduce leaks | $734 | $545 | - | - | $734 | |
TOTAL RECOMMENDED | $16,802 | $6,915 |
$12,349
181,614
kWh
|
$3,719
-
kW-mo/yr
|
$734 | ||
TOTAL IMPLEMENTED | $1,293 | $950 |
$522
7,680
kWh
|
$771
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs