ITAC Assessment: AS0434
ITAC logo
ITAC Assessment: AS0434
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Precision metal parts, milled and ground to customer specifications
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 45,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,067 4,114,169
kWh
Electricity Demand $52,783 23,443
kW-mo/yr
Electricity Fees $108,273 -
TOTAL YEARLY COSTS $406,124
RECOMMENDED SAVINGS* $133,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $307

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4224: Upgrade controls on compressors $68,034 $6,582 $66,620
693,950
kWh
$1,414
-
kW-mo/yr
02 2.4224: Upgrade controls on compressors $43,502 $4,394 $41,480
370,360
kWh
$2,022
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,405 $1,200 $11,108
115,710
kWh
$297
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,250 $2,513 $7,072
73,668
kWh
$178
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,564 $60 $2,415
21,563
kWh
$149
-
kW-mo/yr
06 2.6242: Minimize operation of equipment maintained in standby condition $461 $450 $461
4,803
kWh
-
07 2.6212: Turn off equipment during breaks, reduce operating time $307 $60 $307
3,197
kWh
-
TOTAL RECOMMENDED $133,523 $15,259 $129,463
1,283,251
kWh
$4,060
-
kW-mo/yr
TOTAL IMPLEMENTED $307 $60 $307
3,197
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs