ITAC Assessment: UD1060
ITAC logo
ITAC Assessment: UD1060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Vehicle Engines
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 100,000
ft2
Annual Production 12,400
units
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,827 735,438
kWh
Electricity Demand $21,663 3,819
kW-mo/yr
Electricity Fees $553 -
Natural Gas $18,917 2,709
MMBtu
Waste Disposal Costs
Water Usage $4,260 970
Tgal
Water Disposal $5,162 970
Tgal
TOTAL YEARLY COSTS $102,382
RECOMMENDED SAVINGS* $13,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,983

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $139 - $112
1,585
kWh
$27
-
kW-mo/yr
- - - -
02 2.7224: Reduce space conditioning during non-working hours $3,987 $912 $1,031
14,547
kWh
- - $2,956
-
MMBtu
- -
03 2.4239: Eliminate or reduce compressed air usage $2,251 $772 $31
434
kWh
$2,220
-
kW-mo/yr
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $653 - $450
6,343
kWh
$203
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $300 $952 $202
2,870
kWh
$98
-
kW-mo/yr
- - - -
06 2.3212: Optimize plant power factor $2,184 $2,800 - - $2,184 - - -
07 2.2628: Utilize a less expensive cooling method $892 $1,613 $892
12,656
kWh
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,544 $17,274 $1,473
20,888
kWh
$711
-
kW-mo/yr
- - $476 $884
TOTAL RECOMMENDED $13,950 $24,323 $4,191
59,323
kWh
$3,259
-
kW-mo/yr
$2,184 $2,956
-
MMBtu
$476 $884
TOTAL IMPLEMENTED $3,983 $18,226 $1,787
25,343
kWh
$836
-
kW-mo/yr
- - $476 $884
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs