Assessment Year | 2005 |
---|---|
Principal Product | Evaporative coolets |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
60,000
ft2
|
Annual Production | 60,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $150,503 | 1,877,127 |
kWh
|
$0.080 |
Natural Gas | $140,318 | 16,555 |
MMBtu
|
$8.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,679 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1213: Direct warmest air to combustion intake | $7,503 | $6,000 | - |
$7,503
-
MMBtu
|
|
02 | 2.4323: Use optimum size and capacity equipment | $7,150 | $6,600 |
$7,150
87,194
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,623 | $100 |
$5,623
68,574
kWh
|
- | |
04 | 2.7134: Use photocell controls | - | $5,538 | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,056 | $1,000 |
$2,056
25,106
kWh
|
- | |
06 | 2.4226: Use / purchase optimum sized compressor | $1,603 | $7,200 |
$1,603
19,552
kWh
|
- | |
07 | 2.9112: Use solar heat to heat water | $591 | $3,200 |
$591
7,202
kWh
|
- | |
08 | 2.2136: Install / repair insulation on steam lines | $103 | $689 | - |
$103
-
MMBtu
|
|
TOTAL RECOMMENDED | $24,629 | $30,327 |
$17,023
207,628
kWh
|
$7,606
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,679 | $6,638 |
$7,679
93,680
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs