ITAC Assessment: OD0074
ITAC logo
ITAC Assessment: OD0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Prestressed Concrete Structures
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 100,000
ft2
Annual Production 27,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,991 624,267
kWh
Electricity Demand $8,150 1,691
kW-mo/yr
Electricity Fees $353 -
Natural Gas $19,039 4,290
MMBtu
Fuel Oil #2 $1,452 144
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,986 $800 n/a $1,986
45,428
kWh
- - - - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $579 $20 n/a $579
13,189
kWh
- - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,247 $1,602 n/a $1,652
33,411
kWh
$595
-
kW-mo/yr
- - - - -
04 2.4133: Use most efficient type of electric motors $239 $373 n/a $151
2,931
kWh
$88
-
kW-mo/yr
- - - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $879 $1,495 n/a - - $879
-
MMBtu
- - - -
06 3.5311: Recover and reuse waste material $104,960 $2,400 n/a - - - - $(-12,960.0) $(-5,280.0) $123,200
07 3.5248: Separate and recycle scrap metal to foundry or for sale $372 - n/a - - - $372
-
lb
- - -
TOTAL RECOMMENDED $111,262 $6,690 $4,368
94,959
kWh
$683
-
kW-mo/yr
$879
-
MMBtu
$372
-
lb
$(-12,960.0) $(-5,280.0) $123,200
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs