ITAC Assessment: AS0403
ITAC logo
ITAC Assessment: AS0403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 475,000
ft2
Annual Production 40,000,000
pieces
Production Hrs. Annual 7,344
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,055,608 16,827,470
kWh
Natural Gas $214,045 36,821
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,727 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,641 $1,000 $17,641
246,721
kWh
-
02 2.4226: Use / purchase optimum sized compressor $16,622 $10,000 $16,622
232,472
kWh
-
03 2.1213: Direct warmest air to combustion intake $15,050 $2,000 - $15,050
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,834 $27,518 $9,834
136,587
kWh
-
05 2.9112: Use solar heat to heat water $580 $3,600 - $580
-
MMBtu
TOTAL RECOMMENDED $59,727 $44,118 $44,097
615,780
kWh
$15,630
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs