ITAC Assessment: AS0397
ITAC logo
ITAC Assessment: AS0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Food products, snacks
NAICS 311919: Other Snack Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 128,000
ft2
Annual Production 18,500,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,150 3,452,800
kWh
Electricity Demand $11,242 6,992
kW-mo/yr
Electricity Fees $17,034 -
Natural Gas $271,769 59,622
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,307 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4226: Use / purchase optimum sized compressor $19,864 $15,000 $19,391
341,329
kWh
$473
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,302 $1,000 $7,033
72,550
kWh
$269
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,147 $6,757 $2,066
35,388
kWh
$81
-
kW-mo/yr
- -
04 3.1192: Reduce scrap production $474 $150 - - - $474
-
lb
05 2.2511: Insulate bare equipment $520 $250 - - $520
-
MMBtu
-
TOTAL RECOMMENDED $30,307 $23,157 $28,490
449,267
kWh
$823
-
kW-mo/yr
$520
-
MMBtu
$474
-
lb
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs