ITAC Assessment: AS0393
ITAC logo
ITAC Assessment: AS0393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Wlak-in coolers
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 45,000
ft2
Annual Production 2,600,000
thousand feet
Production Hrs. Annual 4,182
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,912 1,276,080
kWh
Electricity Demand $4,089 2,571
kW-mo/yr
Electricity Fees $5,657 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,064 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 4.445: Install equipment to move product $55,760 $2,000 - - $55,760
02 4.448: Install automatic part storage / retreval system $29,744 $15,000 - - $29,744
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,557 $210 $3,314
54,165
kWh
$243
-
kW-mo/yr
-
04 2.2622: Replace existing chiller with high efficiency model $2,674 $5,500 $2,380
38,893
kWh
$294
-
kW-mo/yr
-
05 2.7124: Make a practice of turning off lights when not needed $2,250 $12,278 $2,073
33,873
kWh
$177
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $1,527 $70 $1,527
24,950
kWh
- -
07 2.7124: Make a practice of turning off lights when not needed $1,152 $1,260 $1,152
18,819
kWh
- -
08 2.4226: Use / purchase optimum sized compressor $968 $3,000 $886
8,084
kWh
$82
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $324 $350 $324
5,292
kWh
- -
10 2.4133: Use most efficient type of electric motors $108 $224 $100
1,630
kWh
$8
-
kW-mo/yr
-
TOTAL RECOMMENDED $98,064 $39,892 $11,756
185,706
kWh
$804
-
kW-mo/yr
$85,504
TOTAL IMPLEMENTED $9,562 $17,042 $9,052
141,521
kWh
$510
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs