Assessment Year 2005
Principal Product Paperboard
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 168,000
ft2
Annual Production 850,000
thousand feet
Production Hrs. Annual 6,576
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,365 3,985,401
kWh
Electricity Demand $13,765 5,754
kW-mo/yr
Electricity Fees $45,401 -
Natural Gas $219,919 48,247
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,022,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
01 4.421: Modify current incentive program $1,000,000 $891,000 - - - $1,000,000
02 3.1163: Use plastic pallets instead of wood $1,000,000 $217,560 - - - $1,000,000
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,212 $16,893 $9,364
186,167
kWh
$848
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,774 $4,055 $3,467
70,039
kWh
$307
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $2,942 $650 - - $2,942
-
MMBtu
-
06 2.2441: Preheat boiler makeup water with waste process heat $773 $700 - - $773
-
MMBtu
-
07 2.4226: Use / purchase optimum sized compressor $4,689 $6,000 $4,429
65,949
kWh
$260
-
kW-mo/yr
- -
TOTAL RECOMMENDED $2,022,390 $1,136,858 $17,260
322,155
kWh
$1,415
-
kW-mo/yr
$3,715
-
MMBtu
$2,000,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs