Assessment Year | 2005 |
---|---|
Principal Product | Paperboard |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
168,000
ft2
|
Annual Production | 850,000
thousand feet
|
Production Hrs. Annual | 6,576
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $197,365 | 3,985,401 |
kWh
|
$0.050 |
Electricity Demand | $13,765 | 5,754 |
kW-mo/yr
|
$2.39 |
Electricity Fees | $45,401 | - |
|
- |
Natural Gas | $219,919 | 48,247 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $2,022,390 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.421: Modify current incentive program | $1,000,000 | $891,000 | - | - | - | $1,000,000 | |
02 | 3.1163: Use plastic pallets instead of wood | $1,000,000 | $217,560 | - | - | - | $1,000,000 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,212 | $16,893 |
$9,364
186,167
kWh
|
$848
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,774 | $4,055 |
$3,467
70,039
kWh
|
$307
-
kW-mo/yr
|
- | - | |
05 | 2.2511: Insulate bare equipment | $2,942 | $650 | - | - |
$2,942
-
MMBtu
|
- | |
06 | 2.2441: Preheat boiler makeup water with waste process heat | $773 | $700 | - | - |
$773
-
MMBtu
|
- | |
07 | 2.4226: Use / purchase optimum sized compressor | $4,689 | $6,000 |
$4,429
65,949
kWh
|
$260
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $2,022,390 | $1,136,858 |
$17,260
322,155
kWh
|
$1,415
-
kW-mo/yr
|
$3,715
-
MMBtu
|
$2,000,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs