ITAC Assessment: AS0390
ITAC logo
ITAC Assessment: AS0390
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Printed Circuit Boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 55,000
ft2
Annual Production 11,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,037 704,764
kWh
Electricity Demand $7,802 2,509
kW-mo/yr
Electricity Fees $565 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,614

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 4.322: Eliminate old stock and modify inventory control $11,500 $80 - - - $11,500
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,783 $400 $8,113
123,224
kWh
$1,670
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,953 $23,750 $3,357
50,868
kWh
$596
-
kW-mo/yr
- -
04 2.7444: Close holes and openings in building such as broken windows $3,384 $15,950 - - $3,384
-
MMBtu
-
05 2.7232: Replace existing hvac unit with high efficiency model $1,779 $197 $1,591
24,100
kWh
$188
-
kW-mo/yr
- -
06 2.6212: Turn off equipment during breaks, reduce operating time $1,590 $230 $1,590
24,090
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,263 $30 $1,073
16,255
kWh
$190
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $289 $450 $289
4,378
kWh
- - -
TOTAL RECOMMENDED $33,541 $41,087 $16,013
242,915
kWh
$2,644
-
kW-mo/yr
$3,384
-
MMBtu
$11,500
TOTAL IMPLEMENTED $24,614 $1,157 $11,066
167,957
kWh
$2,048
-
kW-mo/yr
- $11,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs