ITAC Assessment: AS0383
ITAC logo
ITAC Assessment: AS0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aluminum extruded products
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 52,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 8,592
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,968 3,551,200
kWh
Electricity Demand $14,400 7,200
kW-mo/yr
Electricity Fees $71,024 -
Natural Gas $117,296 15,112
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $629,917 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $842 $200 $807
12,952
kWh
$35
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,498 $120 $20,574
330,870
kWh
$924
-
kW-mo/yr
- - - -
03 4.652: Replace existing equipment with more suitable substitutes $16,320 $40,000 - - - $1,020 - $15,300
04 2.7135: Install occupancy sensors $2,878 $1,350 $2,878
46,240
kWh
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,064 $12,003 $1,933
31,067
kWh
$131
-
kW-mo/yr
- - - -
06 2.2514: Cover open tanks $4,988 $6,000 - - $4,988
-
MMBtu
- - -
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $244 $600 - - $244
-
MMBtu
- - -
08 2.4226: Use / purchase optimum sized compressor $2,942 $600 $2,816
45,258
kWh
$126
-
kW-mo/yr
- - - -
09 2.4133: Use most efficient type of electric motors $406 $367 $388
6,241
kWh
$18
-
kW-mo/yr
- - - -
10 4.711: Initiate a total quality management program $577,735 $9,735 - - - - $577,735 -
TOTAL RECOMMENDED $629,917 $70,975 $29,396
472,628
kWh
$1,234
-
kW-mo/yr
$5,232
-
MMBtu
$1,020 $577,735 $15,300
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs