ITAC Assessment: AS0359
ITAC logo
ITAC Assessment: AS0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Laboratory and Analytical Instruments for Medical Industry
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range n/a
# of Employees 400
Plant Area 225,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,358
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,431 3,826,570
kWh
Electricity Demand $82,960 9,990
kW-mo/yr
Electricity Fees $19,132 -
Natural Gas $47,089 5,106
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,458 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $14,100 $750 $14,100
209,880
kWh
-
02 2.7232: Replace existing hvac unit with high efficiency model $73,763 $118,320 $63,847
950,400
kWh
$9,916
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $127 $200 $84
1,253
kWh
$43
-
kW-mo/yr
04 2.4226: Use / purchase optimum sized compressor $558 $850 $558
8,310
kWh
-
05 2.2622: Replace existing chiller with high efficiency model $4,910 $9,710 $3,201
47,651
kWh
$1,709
-
kW-mo/yr
TOTAL RECOMMENDED $93,458 $129,830 $81,790
1,217,494
kWh
$11,668
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs