ITAC Assessment: AS0354
ITAC logo
ITAC Assessment: AS0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Load Cells and Force Measurement Devices
NAICS 334515: Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 20,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,035
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,140 812,800
kWh
Electricity Demand $3,429 2,124
kW-mo/yr
Electricity Fees $4,437 -
Natural Gas $334 7
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,021 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,035

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,103 $9,525 $1,456
29,119
kWh
$647
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $1,258 $136 $1,042
6,732
kWh
$216
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $756 $825 $756
16,583
kWh
- -
04 2.6218: Turn off equipment when not in use $779 - $779
17,094
kWh
- -
05 2.7232: Replace existing hvac unit with high efficiency model $1,918 $4,500 $1,607
35,249
kWh
$311
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $117 $60 $88
1,931
kWh
$29
-
kW-mo/yr
-
07 2.4314: Use synthetic lubricant $352 $174 $49
1,072
kWh
$12
-
kW-mo/yr
$291
08 2.4231: Reduce the pressure of compressed air to the minimum required $8,467 $1,500 $6,887
151,025
kWh
$1,580
-
kW-mo/yr
-
09 2.4226: Use / purchase optimum sized compressor $271 $430 $54
1,188
kWh
$217
-
kW-mo/yr
-
TOTAL RECOMMENDED $16,021 $17,150 $12,718
259,993
kWh
$3,012
-
kW-mo/yr
$291
TOTAL IMPLEMENTED $2,035 $4,560 $1,695
37,180
kWh
$340
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs