ITAC Assessment: AS0343
ITAC logo
ITAC Assessment: AS0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product FNC Batteries for Aircraft
NAICS 335911: Storage Battery Manufacturing
SIC 3691: Storage Batteries
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 41,000
ft2
Annual Production 2,100
pieces
Production Hrs. Annual 4,233
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,680 3,421,252
kWh
Electricity Demand $21,747 7,731
kW-mo/yr
Electricity Fees $17,262 -
Natural Gas $22,311 2,406
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $492,476 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,493

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,371 $20,633 $1,958
49,433
kWh
$1,413
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $228 $30 $132
3,341
kWh
$96
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,795 $30 $6,139
121,804
kWh
$656
-
kW-mo/yr
- - -
04 2.4311: Recover mechanical energy $1,455 $250 $845
21,333
kWh
$610
-
kW-mo/yr
- - -
05 2.2622: Replace existing chiller with high efficiency model $12,973 $30,140 $7,530
190,158
kWh
$5,443
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,552 $6,867 $14,059
355,028
kWh
$6,493
-
kW-mo/yr
- - -
07 2.4133: Use most efficient type of electric motors $48 $134 $30
765
kWh
$18
-
kW-mo/yr
- - -
08 3.5248: Separate and recycle scrap metal to foundry or for sale $6,600 $60 - - - $6,600 -
09 4.426: Modify workload $41,600 $250 - - $41,600 - -
10 4.446: Automate finishing process $10,575 $22,000 - - $10,575 - -
11 4.514: Re-arrange equipment layout to reduce handling costs $68,455 $3,840 - - - $68,455 -
12 4.111: Add equipment/ operators to reduce production bottleneck $319,824 $3,600 - - - - $319,824
TOTAL RECOMMENDED $492,476 $87,834 $30,693
741,862
kWh
$14,729
-
kW-mo/yr
$52,175 $75,055 $319,824
TOTAL IMPLEMENTED $89,493 $49,840 $22,156
526,265
kWh
$8,562
-
kW-mo/yr
$52,175 $6,600 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs