ITAC Assessment: AS0279
ITAC logo
ITAC Assessment: AS0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Custom Plastic Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 50,000
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 6,936
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,975 3,141,852
kWh
Electricity Demand $17,608 6,568
kW-mo/yr
Electricity Fees $13,704 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,612 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,131 $4,889 $1,070
31,067
kWh
$1,061
-
kW-mo/yr
- - - -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $716 $2,600 $716
20,809
kWh
- - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $858 $60 $561
16,413
kWh
$297
-
kW-mo/yr
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,610 $3,800 $2,338
67,995
kWh
$1,272
-
kW-mo/yr
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,223 $3,800 $725
21,102
kWh
$498
-
kW-mo/yr
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,961 $8,285 $5,804
168,816
kWh
$3,157
-
kW-mo/yr
- - - -
07 2.4133: Use most efficient type of electric motors $1,617 $1,591 $957
27,843
kWh
$660
-
kW-mo/yr
- - - -
08 2.7261: Install timers and/or thermostats $573 $600 $573
16,706
kWh
- - - - -
09 3.5217: Reuse / recycle/ sell paper products $1,632 $120 - - - - $(-708.0) $2,340
10 3.4154: Eliminate leaks in water lines and valves $421 $110 - - $421
-
Tgal
- - -
11 4.432: Cross-train personnel to avoid lost time $28,870 $4,880 - - - $28,870 - -
TOTAL RECOMMENDED $50,612 $30,735 $12,744
370,751
kWh
$6,945
-
kW-mo/yr
$421
-
Tgal
$28,870 $(-708.0) $2,340
TOTAL IMPLEMENTED $30,149 $5,050 $561
16,413
kWh
$297
-
kW-mo/yr
$421
-
Tgal
$28,870 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs