Assessment Year | 2000 |
---|---|
Principal Product | Custom Plastic Products |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
50,000
ft2
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 6,936
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $166,975 | 3,141,852 |
kWh
|
$0.053 |
Electricity Demand | $17,608 | 6,568 |
kW-mo/yr
|
$2.68 |
Electricity Fees | $13,704 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,612 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,149 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,131 | $4,889 |
$1,070
31,067
kWh
|
$1,061
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $716 | $2,600 |
$716
20,809
kWh
|
- | - | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $858 | $60 |
$561
16,413
kWh
|
$297
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,610 | $3,800 |
$2,338
67,995
kWh
|
$1,272
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,223 | $3,800 |
$725
21,102
kWh
|
$498
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,961 | $8,285 |
$5,804
168,816
kWh
|
$3,157
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $1,617 | $1,591 |
$957
27,843
kWh
|
$660
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7261: Install timers and/or thermostats | $573 | $600 |
$573
16,706
kWh
|
- | - | - | - | - | |
09 | 3.5217: Reuse / recycle/ sell paper products | $1,632 | $120 | - | - | - | - | $(-708.0) | $2,340 | |
10 | 3.4154: Eliminate leaks in water lines and valves | $421 | $110 | - | - |
$421
-
Tgal
|
- | - | - | |
11 | 4.432: Cross-train personnel to avoid lost time | $28,870 | $4,880 | - | - | - | $28,870 | - | - | |
TOTAL RECOMMENDED | $50,612 | $30,735 |
$12,744
370,751
kWh
|
$6,945
-
kW-mo/yr
|
$421
-
Tgal
|
$28,870 | $(-708.0) | $2,340 | ||
TOTAL IMPLEMENTED | $30,149 | $5,050 |
$561
16,413
kWh
|
$297
-
kW-mo/yr
|
$421
-
Tgal
|
$28,870 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs