ITAC Assessment: AS0264
ITAC logo
ITAC Assessment: AS0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Paper Products
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 90,000
ft2
Annual Production 9,000
thousand feet
Production Hrs. Annual 2,375
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,658 492,966
kWh
Electricity Demand $4,641 1,777
kW-mo/yr
Electricity Fees $3,097 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $140,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,077 $3,520 $757
13,482
kWh
$320
-
kW-mo/yr
- - - -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,413 $5,527 $2,413
42,790
kWh
- - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $318 $60 $88
1,465
kWh
$230
-
kW-mo/yr
- - - -
04 2.7261: Install timers and/or thermostats $540 $750 $540
9,672
kWh
- - - - -
05 3.5217: Reuse / recycle/ sell paper products $1,073 $120 - - $(-802.0)
-
lb
$1,875 - -
06 4.821: Pay bills on time to avoid late fees $390 $60 - - - - $390 -
07 4.112: Replace old machine with new automatic multi-station tool $63,000 $67,220 - - - - - $63,000
08 4.513: Re-arrange equipment layout to reduce labor costs $71,250 $300 - - - $71,250 - -
TOTAL RECOMMENDED $140,061 $77,557 $3,798
67,409
kWh
$550
-
kW-mo/yr
$(-802.0)
-
lb
$73,125 $390 $63,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs