Assessment Year | 1999 |
---|---|
Principal Product | PVC Plastic Pipes |
NAICS |
n/a
|
SIC | 3084: Plastics Pipe |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
150,000
ft2
|
Annual Production | 55,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $592,179 | 10,478,312 |
kWh
|
$0.057 |
Electricity Demand | $31,257 | 17,881 |
kW-mo/yr
|
$1.75 |
Electricity Fees | $41,069 | - |
|
- |
Natural Gas | $30,362 | 4,528 |
MMBtu
|
$6.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $317,391 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $279,736 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,578 | $5,361 |
$1,121
24,326
kWh
|
$457
-
kW-mo/yr
|
- | - | - | |
02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $891 | $540 |
$891
18,464
kWh
|
- | - | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $9,763 | $12,331 |
$7,842
163,247
kWh
|
$1,921
-
kW-mo/yr
|
- | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,184 | $1,400 |
$4,252
88,511
kWh
|
$932
-
kW-mo/yr
|
- | - | - | |
05 | 2.6218: Turn off equipment when not in use | $24,464 | $600 |
$45,545
885,404
kWh
|
$10,419
-
kW-mo/yr
|
$(-31,500.0) | - | - | |
06 | 2.4131: Size electric motors for peak operating efficiency | $14,379 | $10,106 |
$11,550
240,328
kWh
|
$2,829
-
kW-mo/yr
|
- | - | - | |
07 | 3.5217: Reuse / recycle/ sell paper products | $4,056 | $120 | - | - | - | $4,056 | - | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $254,016 | $29,406 | - | - | - | - | $254,016 | |
09 | 4.231: Purchase equipment instead of leasing | $3,060 | $11,280 | - | - | - | $3,060 | - | |
TOTAL RECOMMENDED | $317,391 | $71,144 |
$71,201
1,420,280
kWh
|
$16,558
-
kW-mo/yr
|
$(-31,500.0) | $7,116 | $254,016 | ||
TOTAL IMPLEMENTED | $279,736 | $57,204 |
$20,513
427,901
kWh
|
$5,207
-
kW-mo/yr
|
- | - | $254,016 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs