ITAC Assessment: AS0263
ITAC logo
ITAC Assessment: AS0263
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product PVC Plastic Pipes
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 150,000
ft2
Annual Production 55,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $592,179 10,478,312
kWh
Electricity Demand $31,257 17,881
kW-mo/yr
Electricity Fees $41,069 -
Natural Gas $30,362 4,528
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $317,391 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $279,736

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,578 $5,361 $1,121
24,326
kWh
$457
-
kW-mo/yr
- - -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $891 $540 $891
18,464
kWh
- - - -
03 2.4133: Use most efficient type of electric motors $9,763 $12,331 $7,842
163,247
kWh
$1,921
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,184 $1,400 $4,252
88,511
kWh
$932
-
kW-mo/yr
- - -
05 2.6218: Turn off equipment when not in use $24,464 $600 $45,545
885,404
kWh
$10,419
-
kW-mo/yr
$(-31,500.0) - -
06 2.4131: Size electric motors for peak operating efficiency $14,379 $10,106 $11,550
240,328
kWh
$2,829
-
kW-mo/yr
- - -
07 3.5217: Reuse / recycle/ sell paper products $4,056 $120 - - - $4,056 -
08 4.111: Add equipment/ operators to reduce production bottleneck $254,016 $29,406 - - - - $254,016
09 4.231: Purchase equipment instead of leasing $3,060 $11,280 - - - $3,060 -
TOTAL RECOMMENDED $317,391 $71,144 $71,201
1,420,280
kWh
$16,558
-
kW-mo/yr
$(-31,500.0) $7,116 $254,016
TOTAL IMPLEMENTED $279,736 $57,204 $20,513
427,901
kWh
$5,207
-
kW-mo/yr
- - $254,016
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs