ITAC Assessment: AS0254
ITAC logo
ITAC Assessment: AS0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Manufactured Homes
NAICS
n/a
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 110,000
ft2
Annual Production 1,100
pieces
Production Hrs. Annual 2,185
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,727 1,181,419
kWh
Electricity Demand $7,922 4,687
kW-mo/yr
Electricity Fees $7,554 -
Natural Gas $6,955 918
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,396 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,761 $10,671 $1,596
33,705
kWh
$1,165
-
kW-mo/yr
- - - -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,410 $3,840 $3,410
71,512
kWh
- - - - -
03 2.7232: Replace existing hvac unit with high efficiency model $2,133 $2,400 $1,725
36,342
kWh
$408
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,330 $840 $2,330
48,945
kWh
- - - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,213 $3,800 $1,652
34,584
kWh
$1,561
-
kW-mo/yr
- - - -
06 3.5131: Recycle white water $14,029 $500 - - $36
-
Tgal
$9,660
-
gal
- $4,333
07 3.5315: Lease / purchase baler; sell cardboard to recycler $420 $120 - - - - $420
-
lb
-
08 4.711: Initiate a total quality management program $51,100 $13,200 - - - - - $51,100
TOTAL RECOMMENDED $79,396 $35,371 $10,713
225,088
kWh
$3,134
-
kW-mo/yr
$36
-
Tgal
$9,660
-
gal
$420
-
lb
$55,433
TOTAL IMPLEMENTED $69,592 $16,940 $4,055
85,287
kWh
$408
-
kW-mo/yr
$36
-
Tgal
$9,660
-
gal
- $55,433
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs