ITAC Assessment: AS0253
ITAC logo
ITAC Assessment: AS0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Metal Framing Products
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 38
Plant Area 60,000
ft2
Annual Production 48,000,000
pieces
Production Hrs. Annual 6,163
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,456 1,012,896
kWh
Electricity Demand $8,188 3,085
kW-mo/yr
Electricity Fees $5,916 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,287

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $1,900 $4,824 $1,550
28,429
kWh
$350
-
kW-mo/yr
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,416 $160 $1,028
18,757
kWh
$388
-
kW-mo/yr
- - - -
03 2.7232: Replace existing hvac unit with high efficiency model $1,563 $1,200 $1,347
24,619
kWh
$216
-
kW-mo/yr
- - - -
04 2.7261: Install timers and/or thermostats $428 $225 $428
7,913
kWh
- - - - -
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $468 $560 $468
8,499
kWh
- - - - -
06 3.6192: Use a less expensive method of waste removal $1,296 $60 - - $1,716
-
gal
- - $(-420.0)
07 3.6192: Use a less expensive method of waste removal $1,611 $1,060 - - - $1,611
-
lb
- -
08 4.821: Pay bills on time to avoid late fees $780 $60 - - - - $780 -
09 2.8114: Change rate schedules or other changes in utility service $2,737 $270 - - - - $2,737 -
TOTAL RECOMMENDED $12,199 $8,419 $4,821
88,217
kWh
$954
-
kW-mo/yr
$1,716
-
gal
$1,611
-
lb
$3,517 $(-420.0)
TOTAL IMPLEMENTED $3,287 $1,905 $896
16,412
kWh
- - $1,611
-
lb
$780 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs