Assessment Year | 1999 |
---|---|
Principal Product | Metal Framing Products |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 38 |
Plant Area |
60,000
ft2
|
Annual Production | 48,000,000
pieces
|
Production Hrs. Annual | 6,163
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $62,456 | 1,012,896 |
kWh
|
$0.062 |
Electricity Demand | $8,188 | 3,085 |
kW-mo/yr
|
$2.65 |
Electricity Fees | $5,916 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,199 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,287 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,900 | $4,824 |
$1,550
28,429
kWh
|
$350
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,416 | $160 |
$1,028
18,757
kWh
|
$388
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $1,563 | $1,200 |
$1,347
24,619
kWh
|
$216
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7261: Install timers and/or thermostats | $428 | $225 |
$428
7,913
kWh
|
- | - | - | - | - | |
05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $468 | $560 |
$468
8,499
kWh
|
- | - | - | - | - | |
06 | 3.6192: Use a less expensive method of waste removal | $1,296 | $60 | - | - |
$1,716
-
gal
|
- | - | $(-420.0) | |
07 | 3.6192: Use a less expensive method of waste removal | $1,611 | $1,060 | - | - | - |
$1,611
-
lb
|
- | - | |
08 | 4.821: Pay bills on time to avoid late fees | $780 | $60 | - | - | - | - | $780 | - | |
09 | 2.8114: Change rate schedules or other changes in utility service | $2,737 | $270 | - | - | - | - | $2,737 | - | |
TOTAL RECOMMENDED | $12,199 | $8,419 |
$4,821
88,217
kWh
|
$954
-
kW-mo/yr
|
$1,716
-
gal
|
$1,611
-
lb
|
$3,517 | $(-420.0) | ||
TOTAL IMPLEMENTED | $3,287 | $1,905 |
$896
16,412
kWh
|
- | - |
$1,611
-
lb
|
$780 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs