ITAC Assessment: AS0249
ITAC logo
ITAC Assessment: AS0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Structural Steel
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 80,000
ft2
Annual Production 4,000
ton
Production Hrs. Annual 2,125
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,978 415,885
kWh
Electricity Demand $7,421 2,938
kW-mo/yr
Electricity Fees $2,285 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings By-product Production Savings
01 2.7261: Install timers and/or thermostats $351 $375 $351
4,982
kWh
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,404 $120 $1,160
16,120
kWh
$244
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $641 $2,625 $549
7,620
kWh
$92
-
kW-mo/yr
- - -
04 3.1191: Change procedures / equipment / operating conditions $213 $792 $52
586
kWh
$12
-
kW-mo/yr
$17
-
gal
$132 -
05 3.6192: Use a less expensive method of waste removal $1,775 $90 - - $1,775
-
gal
- -
06 4.212: Adopt in-house material generation $6,187 $90 - - - - $6,187
TOTAL RECOMMENDED $10,571 $4,092 $2,112
29,308
kWh
$348
-
kW-mo/yr
$1,792
-
gal
$132 $6,187
TOTAL IMPLEMENTED $6,400 $882 $52
586
kWh
$12
-
kW-mo/yr
$17
-
gal
$132 $6,187
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs