ITAC Assessment: AS0248
ITAC logo
ITAC Assessment: AS0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Business Forms
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 65,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,493 1,747,362
kWh
Electricity Demand $13,953 5,000
kW-mo/yr
Electricity Fees $6,315 -
LPG $3,807 212
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,824

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,789 $16,031 $3,737
75,909
kWh
$1,052
-
kW-mo/yr
- -
02 2.6211: Conserve energy by efficient use of vending machines $358 $30 $308
6,155
kWh
$50
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $2,014 $3,338 $1,525
30,774
kWh
$489
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $12,875 $240 $12,875
260,551
kWh
- - -
05 2.7232: Replace existing hvac unit with high efficiency model $4,607 $4,200 $3,764
76,202
kWh
$843
-
kW-mo/yr
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $3,334 $4,260 $3,334
67,409
kWh
- - -
07 3.5217: Reuse / recycle/ sell paper products $21,288 $90 - - $21,288
-
lb
-
08 3.6192: Use a less expensive method of waste removal $5,223 $30 - - $5,223
-
lb
-
09 4.652: Replace existing equipment with more suitable substitutes $1,502 $2,900 - - - $1,502
TOTAL RECOMMENDED $55,990 $31,119 $25,543
517,000
kWh
$2,434
-
kW-mo/yr
$26,511
-
lb
$1,502
TOTAL IMPLEMENTED $36,824 $11,948 $8,931
180,540
kWh
$1,382
-
kW-mo/yr
$26,511
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs