ITAC Assessment: AS0246
ITAC logo
ITAC Assessment: AS0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Semiconductors
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $50
M
to 100
M
# of Employees 490
Plant Area 80,000
ft2
Annual Production 728,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $644,280 12,961,606
kWh
Electricity Demand $64,927 22,276
kW-mo/yr
Electricity Fees $53,104 -
Natural Gas $235,957 47,021
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $293,028 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,703 $26,778 $15,648
404,455
kWh
$6,055
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $1,677 $2,148 $1,202
31,067
kWh
$475
-
kW-mo/yr
- - -
03 2.7232: Replace existing hvac unit with high efficiency model $3,361 $2,700 $2,412
62,427
kWh
$949
-
kW-mo/yr
- - -
04 3.8314: Purchase high materials in returnable bulk containers $14,376 $15,000 - - $14,376
-
lb
- -
05 4.812: Apply for investment incentives $7,303 $60 - - - - $7,303
06 4.446: Automate finishing process $244,608 $111,104 - - - $244,608 -
TOTAL RECOMMENDED $293,028 $157,790 $19,262
497,949
kWh
$7,479
-
kW-mo/yr
$14,376
-
lb
$244,608 $7,303
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs