ITAC Assessment: AS0244
ITAC logo
ITAC Assessment: AS0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Dairy and Non-dairy creamer product
NAICS
n/a
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 30,000
ft2
Annual Production 1,380,000,000
pieces
Production Hrs. Annual 8,664
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,618 3,276,084
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $396,410 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Increase in Production Savings
01 2.7135: Install occupancy sensors $522 $1,800 n/a $522
9,672
kWh
- - - -
02 2.4133: Use most efficient type of electric motors $2,441 $9,669 n/a $2,441
44,549
kWh
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $16,388 $120 n/a $16,388
299,238
kWh
- - - -
04 3.6192: Use a less expensive method of waste removal $15,768 $480 n/a - - $15,768
-
lb
- -
05 4.231: Purchase equipment instead of leasing $14,400 $50,000 n/a - - - $14,400 -
06 4.111: Add equipment/ operators to reduce production bottleneck $346,891 $10,000 n/a - $(-26,442.0)
-
Tgal
- - $373,333
TOTAL RECOMMENDED $396,410 $72,069 $19,351
353,459
kWh
$(-26,442.0)
-
Tgal
$15,768
-
lb
$14,400 $373,333
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs