ITAC Assessment: AS0235
ITAC logo
ITAC Assessment: AS0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Electrical Wiring Harnesses
NAICS
n/a
SIC 3795: Tanks and Tank Components
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 38,000
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,149 294,256
kWh
Electricity Demand $14,098 1,484
kW-mo/yr
Electricity Fees $1,828 -
LPG $8,798 903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,242 $18,549 $3,213
55,393
kWh
$3,029
-
kW-mo/yr
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $395 $253 $102
1,758
kWh
$82
-
kW-mo/yr
$187 - $24 - -
03 2.7124: Make a practice of turning off lights when not needed $1,571 $939 $795
13,775
kWh
$776
-
kW-mo/yr
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $300 $305 $154
2,638
kWh
$34
-
kW-mo/yr
$62 - $50 - -
05 2.7261: Install timers and/or thermostats $294 $375 $294
4,982
kWh
- - - - - -
06 3.6192: Use a less expensive method of waste removal $670 $60 - - - $670 - - -
07 4.652: Replace existing equipment with more suitable substitutes $163 $521 - - $(-20.0) $300 $(-105.0) $(-12.0)
-
Tgal
-
08 4.322: Eliminate old stock and modify inventory control $45,000 $47,960 - - - - - - $45,000
TOTAL RECOMMENDED $54,635 $68,962 $4,558
78,546
kWh
$3,921
-
kW-mo/yr
$229 $970 $(-31.0) $(-12.0)
-
Tgal
$45,000
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs