ITAC Assessment: AS0234
ITAC logo
ITAC Assessment: AS0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Automated Machinery
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $5
M
to 10
M
# of Employees 22
Plant Area 40,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 2,725
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,036 461,899
kWh
Electricity Demand $3,771 1,444
kW-mo/yr
Electricity Fees $3,103 -
Natural Gas $4,451 680
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,173 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $135,468

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings By-product Production Savings
01 2.7261: Install timers and/or thermostats $324 $525 $324
5,862
kWh
- - - -
02 2.7141: Lower light fixtures in high ceiling areas $1,398 $4,425 $1,097
20,223
kWh
$301
-
kW-mo/yr
- - -
03 3.6192: Use a less expensive method of waste removal $3,384 $60 - - $3,384
-
lb
- -
04 4.322: Eliminate old stock and modify inventory control $132,000 $48,000 - - - - $132,000
05 4.812: Apply for investment incentives $900 $60 - - - $900 -
06 2.8114: Change rate schedules or other changes in utility service $83 $100 - - - $83 -
07 4.454: Modify startup/shutdown times $84 $360 $84
15,533
kWh
- - - -
TOTAL RECOMMENDED $138,173 $53,530 $1,505
41,618
kWh
$301
-
kW-mo/yr
$3,384
-
lb
$983 $132,000
TOTAL IMPLEMENTED $135,468 $48,420 $84
15,533
kWh
- $3,384
-
lb
- $132,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs