ITAC Assessment: AS0227
ITAC logo
ITAC Assessment: AS0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Recycled Rubber
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 47
Plant Area 60,000
ft2
Annual Production 34,500,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,993 8,414,127
kWh
Electricity Demand $144,851 16,731
kW-mo/yr
Electricity Fees $83,303 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $204,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $132,745

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,248 $4,077 $1,300
42,497
kWh
$948
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $558 $975 $332
10,844
kWh
$226
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,576 $3,402 $2,852
93,200
kWh
$1,724
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $15,653 $26,233 $9,755
318,288
kWh
$5,898
-
kW-mo/yr
- -
05 2.6218: Turn off equipment when not in use $1,301 $60 $811
26,377
kWh
$490
-
kW-mo/yr
- -
06 3.1291: Eliminate practice of mixing waste streams $700 $30 - - $700
-
gal
-
07 4.451: Add additional production shift $55,877 $3,200 - - - $55,877
08 4.231: Purchase equipment instead of leasing $123,920 $215,000 - - - $123,920
TOTAL RECOMMENDED $204,833 $252,977 $15,050
491,206
kWh
$9,286
-
kW-mo/yr
$700
-
gal
$179,797
TOTAL IMPLEMENTED $132,745 $222,569 $4,963
162,074
kWh
$3,162
-
kW-mo/yr
$700
-
gal
$123,920
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs