Assessment Year | 1998 |
---|---|
Principal Product | Pre-Cast Concrete Pieces |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
2,047,328
ft2
|
Annual Production | 13
Tgal
|
Production Hrs. Annual | 3,750
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $153,983 | 2,493,845 |
kWh
|
$0.062 |
Electricity Demand | $24,366 | 8,912 |
kW-mo/yr
|
$2.73 |
Electricity Fees | $183,855 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $105,899 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $77,808 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,749 | $5,531 |
$1,741
36,049
kWh
|
$1,008
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7135: Install occupancy sensors | $508 | $1,200 |
$349
7,327
kWh
|
$159
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7261: Install timers and/or thermostats | $600 | $825 |
$600
12,603
kWh
|
- | - | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $2,028 | $4,538 |
$1,374
28,722
kWh
|
$654
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4314: Use synthetic lubricant | $1,949 | $4,010 |
$280
5,862
kWh
|
$133
-
kW-mo/yr
|
- |
$173
-
gal
|
- | $1,363 | |
06 | 3.4155: Meter waste water | $14,160 | $5,000 | - | - | - | - | $14,160 | - | |
07 | 3.7214: Reduce or eliminate waste | $8,725 | $1,000 | - | - |
$8,725
-
Tgal
|
- | - | - | |
08 | 4.451: Add additional production shift | $75,180 | $240 | - | - | - | - | $75,180 | - | |
TOTAL RECOMMENDED | $105,899 | $22,344 |
$4,344
90,563
kWh
|
$1,954
-
kW-mo/yr
|
$8,725
-
Tgal
|
$173
-
gal
|
$89,340 | $1,363 | ||
TOTAL IMPLEMENTED | $77,808 | $5,603 |
$1,974
41,325
kWh
|
$654
-
kW-mo/yr
|
- | - | $75,180 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs