ITAC Assessment: AS0225
ITAC logo
ITAC Assessment: AS0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Pre-Cast Concrete Pieces
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 2,047,328
ft2
Annual Production 13
Tgal
Production Hrs. Annual 3,750
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,983 2,493,845
kWh
Electricity Demand $24,366 8,912
kW-mo/yr
Electricity Fees $183,855 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,899 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,808

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,749 $5,531 $1,741
36,049
kWh
$1,008
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $508 $1,200 $349
7,327
kWh
$159
-
kW-mo/yr
- - - -
03 2.7261: Install timers and/or thermostats $600 $825 $600
12,603
kWh
- - - - -
04 2.4133: Use most efficient type of electric motors $2,028 $4,538 $1,374
28,722
kWh
$654
-
kW-mo/yr
- - - -
05 2.4314: Use synthetic lubricant $1,949 $4,010 $280
5,862
kWh
$133
-
kW-mo/yr
- $173
-
gal
- $1,363
06 3.4155: Meter waste water $14,160 $5,000 - - - - $14,160 -
07 3.7214: Reduce or eliminate waste $8,725 $1,000 - - $8,725
-
Tgal
- - -
08 4.451: Add additional production shift $75,180 $240 - - - - $75,180 -
TOTAL RECOMMENDED $105,899 $22,344 $4,344
90,563
kWh
$1,954
-
kW-mo/yr
$8,725
-
Tgal
$173
-
gal
$89,340 $1,363
TOTAL IMPLEMENTED $77,808 $5,603 $1,974
41,325
kWh
$654
-
kW-mo/yr
- - $75,180 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs