ITAC Assessment: AS0215
ITAC logo
ITAC Assessment: AS0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Powder Coating
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 15,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,138 642,145
kWh
Electricity Fees $6,297 -
Natural Gas $15,731 3,569
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,061

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,408 $2,681 $1,408
12,896
kWh
- - -
02 2.7135: Install occupancy sensors $185 $450 $185
1,758
kWh
- - -
03 2.7111: Reduce illumination to minimum necessary levels $371 $315 $371
3,224
kWh
- - -
04 2.7232: Replace existing hvac unit with high efficiency model $1,409 $1,500 $1,409
12,896
kWh
- - -
05 2.7261: Install timers and/or thermostats $564 $480 $564
5,275
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $534 $30 $534
4,982
kWh
- - -
07 3.7121: Improve handling practices $370 - - - $370 -
08 3.5313: Increase amount of waste recovered for resale $192 $15 - - - $192
09 4.652: Replace existing equipment with more suitable substitutes $16,847 $43,100 $31,831
290,739
kWh
$(-14,984.0)
-
MMBtu
- -
TOTAL RECOMMENDED $21,880 $48,571 $36,302
331,770
kWh
$(-14,984.0)
-
MMBtu
$370 $192
TOTAL IMPLEMENTED $3,061 $3,641 $2,691
24,911
kWh
- $370 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs