ITAC Assessment: AR0165
ITAC logo
ITAC Assessment: AR0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Injection molding
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 131,250
ft2
Annual Production 15,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $339,968 12,793,377
kWh
Electricity Demand $230,570 21,742
kW-mo/yr
Natural Gas $14,777 2,902
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,771 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $440 $767 n/a $262
9,672
kWh
$178
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $91 - n/a $55
2,052
kWh
$36
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $2,463 $4,772 n/a $1,545
57,151
kWh
$918
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $22,777 $3,207 n/a $6,946
155,627
kWh
$3,168
-
kW-mo/yr
- $12,663
05 4.423: Move product using mechanical means $14,000 $32,400 n/a - - $14,000 -
TOTAL RECOMMENDED $39,771 $41,146 $8,808
224,502
kWh
$4,300
-
kW-mo/yr
$14,000 $12,663
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs