Assessment Year | 1997 |
---|---|
Principal Product | Commercial Printing |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
18,000
ft2
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,927 | 568,288 |
kWh
|
$0.10 |
Electricity Fees | $5,542 | - |
|
- |
Natural Gas | $439 | 41 |
MMBtu
|
$10.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,094 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,372 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $748 | $771 |
$748
6,741
kWh
|
- | - | - | - | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $12,440 | $6,500 |
$12,440
113,716
kWh
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $370 | $60 |
$370
3,517
kWh
|
- | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,398 | $1,360 |
$1,398
12,896
kWh
|
- | - | - | - | |
05 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $1,384 | $320 |
$1,384
12,603
kWh
|
- | - | - | - | |
06 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $4,898 | $8,400 |
$4,898
44,842
kWh
|
- | - | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $1,805 | $901 |
$1,805
16,413
kWh
|
- | - | - | - | |
08 | 3.6192: Use a less expensive method of waste removal | $1,000 | $30 | - | - | - | $1,000 | - | |
09 | 3.6192: Use a less expensive method of waste removal | $4,811 | $60 | - | - | - | $4,811 | - | |
10 | 3.5316: Contract a wood pallet recycling company | $3,900 | - | - |
$300
-
lb
|
- | - | $3,600 | |
11 | 3.6192: Use a less expensive method of waste removal | $1,440 | $60 | - | - | - | $1,440 | - | |
12 | 4.652: Replace existing equipment with more suitable substitutes | $3,900 | $7,500 | - | - |
$3,900
-
lb
|
- | - | |
TOTAL RECOMMENDED | $38,094 | $25,962 |
$23,043
210,728
kWh
|
$300
-
lb
|
$3,900
-
lb
|
$7,251 | $3,600 | ||
TOTAL IMPLEMENTED | $18,372 | $10,712 |
$4,321
39,567
kWh
|
$300
-
lb
|
$3,900
-
lb
|
$6,251 | $3,600 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs