Assessment Year | 1997 |
---|---|
Principal Product | Pressure Sensitive Labels |
NAICS |
n/a
|
SIC | 2641: |
Sales Range | $10 M to 50M |
# of Employees | 66 |
Plant Area |
58,000
ft2
|
Annual Production | 20,000
thousand feet
|
Production Hrs. Annual | 4,950
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $96,802 | 1,675,264 |
kWh
|
$0.058 |
Electricity Demand | $11,851 | 4,272 |
kW-mo/yr
|
$2.77 |
Electricity Fees | $9,628 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,391 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,732 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $13,061 | $18,500 |
$7,110
182,005
kWh
|
$5,951
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,941 | $17 |
$1,143
29,308
kWh
|
$798
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7261: Install timers and/or thermostats | $1,567 | $1,440 |
$1,567
40,152
kWh
|
- | - | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,154 | $224 |
$563
14,361
kWh
|
$591
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4131: Size electric motors for peak operating efficiency | $464 | $621 |
$264
6,741
kWh
|
$200
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7135: Install occupancy sensors | $313 | $300 |
$213
5,569
kWh
|
$100
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $9,346 | $14,000 |
$(-16.0)
293
kWh
|
- |
$10,584
-
gal
|
$(-442.0) | - | $(-780.0) | |
08 | 3.6192: Use a less expensive method of waste removal | $1,344 | $34 | - | - | - | - | $1,344 | - | |
09 | 4.452: Eliminate shift | $26,201 | $100 |
$551
14,068
kWh
|
- | - | $25,650 | - | - | |
TOTAL RECOMMENDED | $55,391 | $35,236 |
$11,395
292,497
kWh
|
$7,640
-
kW-mo/yr
|
$10,584
-
gal
|
$25,208 | $1,344 | $(-780.0) | ||
TOTAL IMPLEMENTED | $38,732 | $16,385 |
$2,929
75,615
kWh
|
$791
-
kW-mo/yr
|
$10,584
-
gal
|
$25,208 | - | $(-780.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs