ITAC Assessment: AS0198
ITAC logo
ITAC Assessment: AS0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Oil Filled Electrical Transformers
NAICS
n/a
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $1
M
to 5
M
# of Employees 26
Plant Area 33,000
ft2
Annual Production 400
pieces
Production Hrs. Annual 4,437
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,630 350,821
kWh
Electricity Demand $1,954 1,224
kW-mo/yr
Electricity Fees $2,990 -
Natural Gas $13,320 2,345
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,846

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,972 $5,673 $2,700
50,703
kWh
$272
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,563 $7,630 $2,299
43,083
kWh
$264
-
kW-mo/yr
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,181 - $943
17,585
kWh
$238
-
kW-mo/yr
- - - -
04 2.4133: Use most efficient type of electric motors $763 $2,805 $661
12,309
kWh
$102
-
kW-mo/yr
- - - -
05 2.7232: Replace existing hvac unit with high efficiency model $648 $700 $585
11,137
kWh
$63
-
kW-mo/yr
- - - -
06 2.7111: Reduce illumination to minimum necessary levels $609 - $609
11,430
kWh
- - - - -
07 2.7135: Install occupancy sensors $280 $225 $280
5,275
kWh
- - - - -
08 2.4314: Use synthetic lubricant $201 $295 $152
2,931
kWh
$39
-
kW-mo/yr
- $1
-
gal
- $9
09 2.7142: Utilize higher efficiency lamps and/or ballasts $144 $90 $137
2,638
kWh
$7
-
kW-mo/yr
- - - -
10 2.7261: Install timers and/or thermostats $135 $320 $135
2,638
kWh
- - - - -
11 3.5316: Contract a wood pallet recycling company $360 - - - - - $360
-
lb
-
12 3.5313: Increase amount of waste recovered for resale $252 - - - - - $252
-
lb
-
13 4.821: Pay bills on time to avoid late fees $761 - - - $761 - - -
TOTAL RECOMMENDED $10,869 $17,738 $8,501
159,729
kWh
$985
-
kW-mo/yr
$761 $1
-
gal
$612
-
lb
$9
TOTAL IMPLEMENTED $8,846 $14,233 $7,255
136,283
kWh
$820
-
kW-mo/yr
$761 $1
-
gal
- $9
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs