ITAC Assessment: HO0229
ITAC logo
ITAC Assessment: HO0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Internal Combustion Products
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 110,000
ft2
Annual Production 8,100
pieces
Production Hrs. Annual 4,394
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,190 1,424,385
kWh
Electricity Demand $46,592 5,164
kW-mo/yr
Electricity Fees $5,961 -
Natural Gas $29,247 4,876
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $295,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,928 $20,007 $3,961
79,132
kWh
$1,967
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $10,032 $700 $10,032
200,762
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,524 $240 $1,524
30,481
kWh
- -
04 4.512: Condense operation into one building $140,367 $106,000 - - $140,367
05 4.111: Add equipment/ operators to reduce production bottleneck $68,250 $500,000 - - $68,250
06 2.3511: Use plant owned transformers or lease transformers $9,899 $20,000 - - $9,899
07 4.423: Move product using mechanical means $5,850 $10,000 - - $5,850
08 4.131: Modify process to reduce material use/cost $5,850 $3,000 - - $5,850
09 4.611: Begin a practice of predictive / preventative maintenance $4,200 $4,500 - - $4,200
10 4.512: Condense operation into one building $4,160 $6,000 - - $4,160
11 4.512: Condense operation into one building $3,900 $8,000 - - $3,900
12 4.321: Optimize production lot sizes and inventories $1,040 $100 - - $1,040
13 4.114: Add/modify equipment to improve drying process $1,040 $600 - - $1,040
14 3.5311: Recover and reuse waste material $33,000 $3,000 - - $33,000
TOTAL RECOMMENDED $295,040 $682,147 $15,517
310,375
kWh
$1,967
-
kW-mo/yr
$277,556
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs