Assessment Year | 2000 |
---|---|
Principal Product | Internal Combustion Products |
NAICS |
n/a
|
SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
110,000
ft2
|
Annual Production | 8,100
pieces
|
Production Hrs. Annual | 4,394
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,190 | 1,424,385 |
kWh
|
$0.050 |
Electricity Demand | $46,592 | 5,164 |
kW-mo/yr
|
$9.02 |
Electricity Fees | $5,961 | - |
|
- |
Natural Gas | $29,247 | 4,876 |
MMBtu
|
$6.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $295,040 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,928 | $20,007 |
$3,961
79,132
kWh
|
$1,967
-
kW-mo/yr
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $10,032 | $700 |
$10,032
200,762
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,524 | $240 |
$1,524
30,481
kWh
|
- | - | |
04 | 4.512: Condense operation into one building | $140,367 | $106,000 | - | - | $140,367 | |
05 | 4.111: Add equipment/ operators to reduce production bottleneck | $68,250 | $500,000 | - | - | $68,250 | |
06 | 2.3511: Use plant owned transformers or lease transformers | $9,899 | $20,000 | - | - | $9,899 | |
07 | 4.423: Move product using mechanical means | $5,850 | $10,000 | - | - | $5,850 | |
08 | 4.131: Modify process to reduce material use/cost | $5,850 | $3,000 | - | - | $5,850 | |
09 | 4.611: Begin a practice of predictive / preventative maintenance | $4,200 | $4,500 | - | - | $4,200 | |
10 | 4.512: Condense operation into one building | $4,160 | $6,000 | - | - | $4,160 | |
11 | 4.512: Condense operation into one building | $3,900 | $8,000 | - | - | $3,900 | |
12 | 4.321: Optimize production lot sizes and inventories | $1,040 | $100 | - | - | $1,040 | |
13 | 4.114: Add/modify equipment to improve drying process | $1,040 | $600 | - | - | $1,040 | |
14 | 3.5311: Recover and reuse waste material | $33,000 | $3,000 | - | - | $33,000 | |
TOTAL RECOMMENDED | $295,040 | $682,147 |
$15,517
310,375
kWh
|
$1,967
-
kW-mo/yr
|
$277,556 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs