Assessment Year | 1996 |
---|---|
Principal Product | Potato and Corn Chip Snacks |
NAICS |
n/a
|
SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
180,000
ft2
|
Annual Production | 25,000
ton
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $529,187 | 8,423,798 |
kWh
|
$0.063 |
Electricity Demand | $27,454 | 14,070 |
kW-mo/yr
|
$1.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,289 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,882 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,388 | $10,000 |
$6,879
145,955
kWh
|
$509
-
kW-mo/yr
|
- | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $8,466 | $4,200 |
$7,229
153,283
kWh
|
$1,237
-
kW-mo/yr
|
- | |
03 | 2.7261: Install timers and/or thermostats | $932 | $2,080 |
$932
19,930
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $119 | $115 |
$113
2,345
kWh
|
$6
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $8,795 | $6,778 |
$8,228
174,678
kWh
|
$567
-
kW-mo/yr
|
- | |
06 | 2.2622: Replace existing chiller with high efficiency model | $2,455 | $3,500 |
$3,234
80,305
kWh
|
$407
-
kW-mo/yr
|
$(-1,186.0)
-
Tgal
|
|
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $283 | - |
$266
5,569
kWh
|
$17
-
kW-mo/yr
|
- | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,148 | $5,730 |
$1,010
21,395
kWh
|
$138
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,607 | $26,161 |
$6,090
129,250
kWh
|
$517
-
kW-mo/yr
|
- | |
10 | 3.4154: Eliminate leaks in water lines and valves | $96 | $100 | - | - |
$96
-
Tgal
|
|
TOTAL RECOMMENDED | $36,289 | $58,664 |
$33,981
732,710
kWh
|
$3,398
-
kW-mo/yr
|
$(-1,090.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | $16,882 | $16,380 |
$15,040
319,168
kWh
|
$1,746
-
kW-mo/yr
|
$96
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs