Assessment Year | 1996 |
---|---|
Principal Product | Laminants PC Boards |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 190 |
Plant Area |
78,000
ft2
|
Annual Production | 15,000
thousand feet
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $520,899 | 11,399,766 |
kWh
|
$0.046 |
Electricity Demand | $177,903 | 59,896 |
kW-mo/yr
|
$2.97 |
Natural Gas | $197,959 | 51,371 |
MMBtu
|
$3.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $87,153 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,755 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,232 | - |
$2,767
94,959
kWh
|
$1,465
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,782 | $430 |
$6,396
219,226
kWh
|
$3,386
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,593 | $500 |
$1,042
35,756
kWh
|
$551
-
kW-mo/yr
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $11,259 | $9,718 |
$7,217
247,362
kWh
|
$4,042
-
kW-mo/yr
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $19,328 | $21,600 |
$12,638
433,470
kWh
|
$6,690
-
kW-mo/yr
|
- | - | - | |
06 | 2.2622: Replace existing chiller with high efficiency model | $1,812 | - |
$1,062
36,342
kWh
|
$750
-
kW-mo/yr
|
- | - | - | |
07 | 2.2622: Replace existing chiller with high efficiency model | $23,483 | $35,000 |
$13,955
474,502
kWh
|
$9,528
-
kW-mo/yr
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,713 | $10,089 |
$2,998
102,579
kWh
|
$1,715
-
kW-mo/yr
|
- | - | - | |
09 | 2.7135: Install occupancy sensors | $950 | $1,425 |
$950
28,429
kWh
|
- | - | - | - | |
10 | 2.1133: Adjust burners for efficient operation | $4,490 | $1,200 | - | - |
$4,490
-
MMBtu
|
- | - | |
11 | 3.4151: Minimize water usage | $5,511 | $5,000 | - | - | - |
$3,657
-
Tgal
|
$1,854 | |
TOTAL RECOMMENDED | $87,153 | $84,962 |
$49,025
1,672,625
kWh
|
$28,127
-
kW-mo/yr
|
$4,490
-
MMBtu
|
$3,657
-
Tgal
|
$1,854 | ||
TOTAL IMPLEMENTED | $37,755 | $36,630 |
$20,351
693,728
kWh
|
$12,914
-
kW-mo/yr
|
$4,490
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs