ITAC Assessment: AS0182
ITAC logo
ITAC Assessment: AS0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Laminants PC Boards
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 78,000
ft2
Annual Production 15,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $520,899 11,399,766
kWh
Electricity Demand $177,903 59,896
kW-mo/yr
Natural Gas $197,959 51,371
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,755

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,232 - $2,767
94,959
kWh
$1,465
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,782 $430 $6,396
219,226
kWh
$3,386
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $1,593 $500 $1,042
35,756
kWh
$551
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $11,259 $9,718 $7,217
247,362
kWh
$4,042
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,328 $21,600 $12,638
433,470
kWh
$6,690
-
kW-mo/yr
- - -
06 2.2622: Replace existing chiller with high efficiency model $1,812 - $1,062
36,342
kWh
$750
-
kW-mo/yr
- - -
07 2.2622: Replace existing chiller with high efficiency model $23,483 $35,000 $13,955
474,502
kWh
$9,528
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,713 $10,089 $2,998
102,579
kWh
$1,715
-
kW-mo/yr
- - -
09 2.7135: Install occupancy sensors $950 $1,425 $950
28,429
kWh
- - - -
10 2.1133: Adjust burners for efficient operation $4,490 $1,200 - - $4,490
-
MMBtu
- -
11 3.4151: Minimize water usage $5,511 $5,000 - - - $3,657
-
Tgal
$1,854
TOTAL RECOMMENDED $87,153 $84,962 $49,025
1,672,625
kWh
$28,127
-
kW-mo/yr
$4,490
-
MMBtu
$3,657
-
Tgal
$1,854
TOTAL IMPLEMENTED $37,755 $36,630 $20,351
693,728
kWh
$12,914
-
kW-mo/yr
$4,490
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs