ITAC Assessment: AS0145
ITAC logo
ITAC Assessment: AS0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Multi-Chip Modules and Memory Products
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 30,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,794 1,410,610
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,661

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,240 $20,292 $9,240
133,939
kWh
02 2.7135: Install occupancy sensors $1,175 $2,250 $1,175
22,567
kWh
03 2.4133: Use most efficient type of electric motors $363 $622 $363
4,396
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $170 - $170
2,052
kWh
05 2.6218: Turn off equipment when not in use $2,611 $360 $2,611
50,410
kWh
06 2.2511: Insulate bare equipment $222 $225 $222
4,396
kWh
07 2.7261: Install timers and/or thermostats $1,370 $3,250 $1,370
26,377
kWh
08 2.7241: Install outside air damper / economizer on hvac unit $4,575 $9,100 $4,575
88,218
kWh
09 2.7232: Replace existing hvac unit with high efficiency model $18,110 $40,700 $18,110
227,140
kWh
TOTAL RECOMMENDED $37,836 $76,799 $37,836
559,495
kWh
TOTAL IMPLEMENTED $36,661 $74,549 $36,661
536,928
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs