ITAC Assessment: AS0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Color Advertisments
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 245
Plant Area 165,000
ft2
Annual Production 427,856,720
pieces
Production Hrs. Annual 7,904
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $972,805 13,260,258
kWh
Natural Gas $148,082 33,682
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $445,255 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $29,087 $49,812 $29,087
396,542
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $1,051 $320 $1,051
14,361
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,591 $158 $1,591
21,688
kWh
-
04 2.7135: Install occupancy sensors $1,081 $975 $1,081
14,654
kWh
-
05 2.7134: Use photocell controls $785 $480 $785
10,844
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $168 $200 $168
2,345
kWh
-
07 2.4133: Use most efficient type of electric motors $18,178 $10,473 $18,178
247,948
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,525 - $1,525
20,809
kWh
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,598 $500 $1,598
21,688
kWh
-
10 2.2622: Replace existing chiller with high efficiency model $54,627 $156,250 $54,627
744,725
kWh
-
11 2.7444: Close holes and openings in building such as broken windows $5,947 $2,800 $5,947
81,184
kWh
-
12 2.2695: Use cascade system of recirculating during cold weather to avoid sub-cooling $10,690 $20,000 $10,690
145,662
kWh
-
13 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,746 $4,972 $1,746
23,740
kWh
-
14 2.2511: Insulate bare equipment $11,350 $40,000 $11,350
154,748
kWh
-
15 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $305,831 $1,059,725 $678,049
13,079,133
kWh
$(-372,218.0)
-
MMBtu
TOTAL RECOMMENDED $445,255 $1,346,665 $817,473
14,980,071
kWh
$(-372,218.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs