ITAC Assessment: OK0289
ITAC logo
ITAC Assessment: OK0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product HARD CANDY
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area
n/a
Annual Production 245,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,608 1,092,907
kWh
Natural Gas $41,291 11,288
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,771 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,499

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $658 $239 $658
13,775
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,469 $719 $1,469
30,774
kWh
-
03 2.1222: Install turbulators $632 $1,350 - $632
-
MMBtu
04 2.2122: Install / repair insulation on condensate lines $114 $135 - $114
-
MMBtu
05 2.2122: Install / repair insulation on condensate lines $81 $129 - $81
-
MMBtu
06 2.7261: Install timers and/or thermostats $161 $250 - $161
-
MMBtu
07 2.7226: Use computer programs to optimize hvac performance $1,579 $1,110 $1,579
50,703
kWh
-
08 2.2136: Install / repair insulation on steam lines $1,077 $1,710 $544
17,585
kWh
$533
-
MMBtu
TOTAL RECOMMENDED $5,771 $5,642 $4,250
112,837
kWh
$1,521
-
MMBtu
TOTAL IMPLEMENTED $4,499 $3,668 $3,706
95,252
kWh
$793
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs