| Assessment Year | 1993 |
|---|---|
| Principal Product | PRINTED BUSINESS FORMS |
| NAICS |
n/a
|
| SIC | 2761: Manifold Business Forms |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
n/a
|
| Annual Production | 17,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $147,114 | 1,745,311 |
kWh
|
$0.084 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $54,922 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,924 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $927 | - |
$1,025
12,309
kWh
|
$(-98.0) | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,648 | $2,240 |
$1,648
19,637
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $310 | $272 |
$310
3,810
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $358 | $350 |
$358
4,396
kWh
|
- | |
| 05 | 2.4133: Use most efficient type of electric motors | $988 | $797 |
$988
11,723
kWh
|
- | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,125 | - |
$3,125
36,928
kWh
|
- | |
| 07 | 2.7234: Use heat pump for space conditioning | $18,313 | $67,500 |
$18,313
217,175
kWh
|
- | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,697 | $56,760 |
$28,697
340,563
kWh
|
- | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $556 | $800 |
$556
6,741
kWh
|
- | |
| TOTAL RECOMMENDED | $54,922 | $128,719 |
$55,020
653,282
kWh
|
$(-98.0) | ||
| TOTAL IMPLEMENTED | $6,924 | $3,662 |
$7,022
83,821
kWh
|
$(-98.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs