ITAC Assessment: AS0087
ITAC logo
ITAC Assessment: AS0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PRINTED BUSINESS FORMS
NAICS
n/a
SIC 2761: Manifold Business Forms
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 17,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,114 1,745,311
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,922 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,924

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $927 - $1,025
12,309
kWh
$(-98.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,648 $2,240 $1,648
19,637
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $310 $272 $310
3,810
kWh
-
04 2.7135: Install occupancy sensors $358 $350 $358
4,396
kWh
-
05 2.4133: Use most efficient type of electric motors $988 $797 $988
11,723
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,125 - $3,125
36,928
kWh
-
07 2.7234: Use heat pump for space conditioning $18,313 $67,500 $18,313
217,175
kWh
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,697 $56,760 $28,697
340,563
kWh
-
09 2.4221: Install compressor air intakes in coolest locations $556 $800 $556
6,741
kWh
-
TOTAL RECOMMENDED $54,922 $128,719 $55,020
653,282
kWh
$(-98.0)
TOTAL IMPLEMENTED $6,924 $3,662 $7,022
83,821
kWh
$(-98.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs