ITAC Assessment: AM0454
ITAC logo
ITAC Assessment: AM0454
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Titanium and stainless steel extrusions
NAICS 331410: Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3356: Rolling, Drawing, and Extruding of Nonferrous Metals, Except Copper and Aluminum
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 133,000
ft2
Annual Production 1,400
pieces
Production Hrs. Annual 3,560
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,888 2,493,724
kWh
Electricity Demand $90,187 29,505
kW-mo/yr
Electricity Fees $65,561 -
Natural Gas $82,272 9,889
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7124: Make a practice of turning off lights when not needed $4,550 - $4,550
64,900
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,440 $200 $1,440
20,500
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $640 $840 $390
5,600
kWh
$250
-
kW-mo/yr
-
04 2.7224: Reduce space conditioning during non-working hours $630 $400 $630
9,000
kWh
- -
05 4.454: Modify startup/shutdown times $1,920 - - - $1,920
TOTAL RECOMMENDED $9,180 $1,440 $7,010
100,000
kWh
$250
-
kW-mo/yr
$1,920
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs